Chula Vista HS Track & Field
The Sweetwater Union High School District is planning on re-vitalizing all five of its high school track and field facilities. Lord Architecture is exploring the design for Bonita Vista High School, which is serving as the prototype for the other 4 schools. Working with DA Hogan and Associates, landscape architects, who are designing the synthetic turf football/soccer field and track events, the structures include ticketing, concessions, and toilet facilities, and a signature canopy over the main gathering and entry point.
