We provided planning, design, and construction administration services for the installation of new playgrounds at ten elementary school campuses. The project included evaluation of each campus to identify appropriate playground equipment and optimize placement based on student use, supervision, safety, accessibility, and campus circulation. Our team coordinated closely with the District to confirm compliant paths of travel to each play structure and integrate improvements seamlessly within existing campus conditions. As part of the project, wood chip surfacing was upgraded to synthetic turf with cushioned safety surfacing to improve durability, accessibility, maintenance, and long-term performance. Additional improvements included new drainage systems and site modifications to support the upgraded surfacing and improve overall functionality.
